Cartaz

NOTÍCIAS & ARQUIVOS

  • 2019/18/04

    PAUL WURTH AT AISTECH 2019

    As a regular participant for many years already, Paul Wurth will again be in close contact with their customers at the AISTech trade fair and conference, this time back to Pittsburgh, Pennsylvania in the USA, on May 06 – 09, 2019.At the exhibition, Paul Wurth’s representatives, participating at the common booth of the SMS group, will be happy to discuss with you news about the company’s products, projects and services.In the frame of the AISTech conference, our colleagues will present a

    Ler esta notícia »

  • 2019/08/04

    MMK SELECTS PAUL WURTH FOR MODERNISATION OF BLAST FURNACE COOLING SYSTEM

    As part of its development strategy, PAO “MMK” (Magnitogorsk, Chelyabinsk region, Russia) will conduct a complete overhaul of its No. 2 blast furnace in 2020. After fundamental renewal and modernisation, the blast furnace will appear as a structure without a lintel ring. In this project, Paul Wurth will help MMK define the profile of the modernised furnace by considering the raw materials base and process conditions of the customer. Detail engineering will be provided for the high-heat loade

    Ler esta notícia »

  • 2019/22/03

    PAUL WURTH WITH DIGITAL SOLUTIONS AT HANNOVER MESSE 2019

    In the frame of a joint stand of Luxembourg enterprises, organised by the Chamber of Commerce of the Grand-Duchy from the heart of Europe, Paul Wurth will participate in the world’s largest Industry show Hannover Messe, from 1 to 5 April 2019.With the ever-faster and ever-increasing integration of digital data and functionalities, the vision of an intelligent, self-learning industrial plant is no longer just a distant dream. For Paul Wurth, the global trend towards digitalisation offers large

    Ler esta notícia »

  • 2019/13/03

    PAUL WURTH BLAST FURNACE EQUIPMENT – LONG-TERM SOLUTIONS FOR EVRAZ NTMK

    Luxembourg, 13 March 2019. By October 2020, EVRAZ will complete a technical upgrade of No. 6 Blast Furnace of their integrated steel works NTMK located at Nizhnij Tagil in the Urals, Russia. The modernization will concern all systems of the existing installation and enables increasing the nominal capacity by about 40% compared to the previous campaign design. With a hearth diameter of 9.8 meters and an inner volume of 2,200 cubic meters, the new furnace will be able to produce 2.5 million tons o

    Ler esta notícia »

  • 2019/07/01

    PAUL WURTH BECOMES NEW LEAD INVESTOR AND TECHNOLOGY PARTNER OF SUNFIRE

    Joint focus on green hydrogen by industrialisation of electrolysis and Power-to-Liquid technology for large scale commercial projects. Plant builder Paul Wurth provides access to global metals industry, which increasingly uses renewable hydrogen. Current Sunfire investors participate again in new round. Dresden & Luxembourg, 7 January 2019. Sunfire GmbH, developer and manufacturer of high efficient electrolysers and fuel cells, secured 25 million euros venture capital in a series C f

    Ler esta notícia »

PRESENÇA INTERNACIONAL

Acesso »

PAUL WURTH S.A.

 32, rue d'Alsace

 L-1122 Luxembourg

 LUXEMBOURG

 P.O. Box 2233

 L-1022 Luxembourg

 LUXEMBOURG

 Tel.: (+352) 4970-1

 Fax.: (+352) 4970-2209

 paulwurth@paulwurth.com

ISO-VCA-SCC