• LÍDER EM TECNOLOGIA DE REDUÇÃO

    LÍDER EM TECNOLOGIA DE REDUÇÃO

    TATA STEEL, ALTO FORNO ‘H” , INDIA

  • NOVOS PADRÕES EM CONSTRUÇÃO DE ALTOS FORNOS

    NOVOS PADRÕES EM CONSTRUÇÃO DE ALTOS FORNOS

    THYSSENKRUPP STEEL AF 8 , HAMBORN – ALEMANHA

  • SOLUÇÕES AVANÇADAS PARA COQUERIAS

    SOLUÇÕES AVANÇADAS PARA COQUERIAS

    BATERIAS DE COQUE B3, ZKS, DILLINGEN – ALEMANHA

  • SAÚDE & SEGURANÇA COMO PRIORIDADE MÁXIMA

    SAÚDE & SEGURANÇA COMO PRIORIDADE MÁXIMA

    BASES DA CULTURA CORPORATIVA PAUL WURTH

  • BUSCANDO A MELHOR SATISFAÇÃO DO CLIENTE

    BUSCANDO A MELHOR SATISFAÇÃO DO CLIENTE

    ALTO FORNO NR. 1, HYUNDAI STEEL, CORÉIA DO SUL

  • GRUPO PAUL WURTH – UM COMPETIDOR GLOBAL

    GRUPO PAUL WURTH – UM COMPETIDOR GLOBAL

    ESTENSA REDE DE ENTIDADES INTERNACIONAIS

  • MAIOR COMPROMETIMENTO COM A PROTEÇÃO AMBIENTAL

    MAIOR COMPROMETIMENTO COM A PROTEÇÃO AMBIENTAL

    UNIDADE DE RECICLAGEM DE RESIDUOS PRIMUS®, DRAGON STEEL, TAIWAN

  • ENGENHARIA INOVADORA

    ENGENHARIA INOVADORA

    SOPRECO® PARA BATERIAS DE COQUE

NOVIDADES

  • 2020/09/06

    Norsk e-Fuel is planning Europe’s first commercial plant for hydrogen-based renewable aviation fuel in Norway

    Leading industry consortium joins forces to make unlimited renewable fuel a reality to achieve climate-neutral transportation Norsk e-fuel is generating renewable fuels from CO2 & water using 100% renewable electricity Located in Herøya, Porsgrunn the output of the first plant will provide enough to cut CO2 emissions of the top five domestic aviation routes in Norway in half Oslo/Dresden/Zurich/Luxembourg/Stavanger – Norsk e-Fuel AS, the new European industry consortium headquart ...

    Leia este artigo »

  • 2020/12/05

    Solid results in 2019 help mitigate the impact of today’s global economic shock

    Under the chairmanship of Michel Wurth, the Ordinary General Meeting of shareholders of Société Anonyme Paul WURTH was held on 12 May 2020 to approve amongst others the financial statements for the year 2019.Given the challenging economic environment, which prevailed already for most of 2019, the group’s reported level of new contracts and its financial result 2019 reflect a good performance. This achievement is all the more important today to mitigate the significant global economic fall-ou ...

    Leia este artigo »

  • 2020/23/03

    Successful INBA Plant Reline at Rogesa’s Dillingen No 4 Blast Furnace

    AG der Dillinger Hüttenwerke (Dillinger) and Paul Wurth completed recently the modernisation of the slag granulation plant at Dillinger’s No. 4 blast furnace. Paul Wurth’s INBA granulation and dewatering technology has been operating there since its initial installation in 2003. It is a cold water system with steam condensation designed for a daily capacity of 1,600 tons of blast furnace slag sand and a maximum slag flow of up to 8 tons/min.After 16 years of operation, the plant was relined ...

    Leia este artigo »

  • 2020/12/03

    MULTIPLHY Green Hydrogen for Renewable Products Refinery in Rotterdam

    CEA, Neste, Paul Wurth, ENGIE and Sunfire announce a project-partnership to build and operate the world’s first multi-megawatt scale high-temperature electrolyser for highly efficient hydrogen production.The MULTIPLHY project – “Multi-megawatt high-temperature electrolyser to generate green hydrogen for the production of high-quality biofuels” has recently been launched at Neste’s renewable products refinery in Rotterdam. The project involves Neste, worlds’s leading provider of renew ...

    Leia este artigo »

  • 2020/05/03

    SSAB Relies on Paul Wurth for Strategic Coke Oven Battery Renewal

    On 31 January 2020, SSAB EMEA AB has chosen Paul Wurth’s service team to carry out, on EPC basis, a revamp of its coke oven battery at Luleå steel works in northern Sweden, which focuses on battery life extension and emission reduction.In line with the group’s motto to be a Leading Partner to its customers, Paul Wurth has first supported SSAB with a detailed feasibility study, which defined the most appropriate implementation scenario to extend the battery life. Secondly, SSAB being a front ...

    Leia este artigo »

PAUL WURTH INCUB

Paul Wurth Incub

PRESENÇA INTERNACIONAL

Acesso »

PAUL WURTH Geprolux S.A.

Acesso a Website >>

PAUL WURTH S.A.

 32, rue d'Alsace

 L-1122 Luxembourg

 LUXEMBOURG

 P.O. Box 2233

 L-1022 Luxembourg

 LUXEMBOURG

 Tel.: (+352) 4970-1

 Fax.: (+352) 4970-2209

 paulwurth@paulwurth.com