• 炼铁技术的引领者

    炼 铁 技 术 的 引 领 者

    印度塔塔钢铁公司H高炉

  • 高炉建造的新标准

    高 炉 建 造 的 新 标 准

    德国汉博蒂森8号高炉

  • 焦化厂先进的解决方案

    焦 化 厂 先 进 的 解 决 方 案

    德国迪灵根ZKS B3号焦炉

  • 健康和安全至上

    健康和安全至上

    PW公司企业文化核心价值观

  • 最佳客户服务

    最 佳 客 户 服 务

    韩国现代制铁1号高炉

  • PW集团-全球企业

    PW集团-全球企业

    覆盖全球的分公司网络

  • 环保技术的最高水准

    环 保 技 术 的 最 高 水 准

    台湾龙钢 PRIMUS® 回收厂

  • 技术革新

    技 术 革 新

    SOPRECO®焦炉单独压力控制系统

新闻

  • 2019.04.18

    PAUL WURTH at AISTech 2019

    As a regular participant for many years already, Paul Wurth will again be in close contact with their customers at the AISTech trade fair and conference, this time back to Pittsburgh, Pennsylvania in the USA, on May 06 – 09, 2019.At the exhibition, Paul Wurth’s representatives, participating at the common booth of the SMS group, will be happy to discuss with you news about the company’s products, projects and services.In the frame of the AISTech conference, our colleagues will present a ...

    阅读这篇文章 »

  • 2019.04.08

    MMK selects Paul Wurth for modernisation of Blast Furnace cooling system

    As part of its development strategy, PAO “MMK” (Magnitogorsk, Chelyabinsk region, Russia) will conduct a complete overhaul of its No. 2 blast furnace in 2020. After fundamental renewal and modernisation, the blast furnace will appear as a structure without a lintel ring. In this project, Paul Wurth will help MMK define the profile of the modernised furnace by considering the raw materials base and process conditions of the customer. Detail engineering will be provided for the high-heat loade ...

    阅读这篇文章 »

  • 2019.03.22

    Paul Wurth with Digital Solutions at Hannover Messe 2019

    In the frame of a joint stand of Luxembourg enterprises, organised by the Chamber of Commerce of the Grand-Duchy from the heart of Europe, Paul Wurth will participate in the world’s largest Industry show Hannover Messe, from 1 to 5 April 2019.With the ever-faster and ever-increasing integration of digital data and functionalities, the vision of an intelligent, self-learning industrial plant is no longer just a distant dream. For Paul Wurth, the global trend towards digitalisation offers large ...

    阅读这篇文章 »

  • 2019.03.13

    Paul Wurth blast furnace equipment – long-term solutions for EVRAZ NTMK

    Luxembourg, 13 March 2019. By October 2020, EVRAZ will complete a technical upgrade of No. 6 Blast Furnace of their integrated steel works NTMK located at Nizhnij Tagil in the Urals, Russia. The modernization will concern all systems of the existing installation and enables increasing the nominal capacity by about 40% compared to the previous campaign design. With a hearth diameter of 9.8 meters and an inner volume of 2,200 cubic meters, the new furnace will be able to produce 2.5 million tons o ...

    阅读这篇文章 »

  • 2019.01.07

    PAUL WURTH BECOMES NEW LEAD INVESTOR AND TECHNOLOGY PARTNER OF SUNFIRE

    Joint focus on green hydrogen by industrialisation of electrolysis and Power-to-Liquid technology for large scale commercial projects. Plant builder Paul Wurth provides access to global metals industry, which increasingly uses renewable hydrogen. Current Sunfire investors participate again in new round. Dresden & Luxembourg, 7 January 2019. Sunfire GmbH, developer and manufacturer of high efficient electrolysers and fuel cells, secured 25 million euros venture capital in a series C f ...

    阅读这篇文章 »

PAUL WURTH INCUB

Paul Wurth Incub

全球服务网络

访问 »

PAUL WURTH Geprolux S.A.

访问网站 >>

PAUL WURTH S.A.

 32, rue d'Alsace

 L-1122 Luxembourg

 LUXEMBOURG

 P.O. Box 2233

 L-1022 Luxembourg

 LUXEMBOURG

 Tel.: (+352) 4970-1

 Fax.: (+352) 4970-2209

 paulwurth@paulwurth.com

ISO-VCA-SCC